| Project |
: |
High speed train line Milan – Bologna. Cable stayed bridge over the Po river
|
| Location |
: |
Po river, Piacenza |
| Type |
: |
P.c. continuous box girder cable stayed deck |
Total lenght of bridge
|
: |
400 m.
|
| Stayed span lenghts |
: |
main span 192 m. and lateral span 104 m each all stayed |
| Deck width |
: |
15 m. |
| Height of towers from deck level |
: |
60 m. |
Stay cable strand
|
: |
530 tons |
| No. of stays |
: |
72 |
| Longest stay cable |
: |
105 m. |
| Max. no. of strands per anchorage |
: |
91 x 15.7 mm. dia.
|
| Main Client |
: |
TAV SpA
|
| Contractor |
: |
ASG scarl |
| Designer |
: |
MPA – Mario Petrangeli e Associati
|
| Period |
: |
2003 - 2006 |