| |
| Project | : | High speed train line Milan – Bologna / Piacenza 1 and Piacenza 2 viaducts |
| Location | : | Po river, Piacenza |
| Type | : | P.c. continuous box girder cable stayed deck |
| Total length of bridge | : | 400 m. |
| Stayed span lengths | : | main span 192 m. and lateral span 104 m each all staye |
| Deck width | : | 15 m |
| Height of towers from deck level | : | 60 m |
| Stay cable strand | : | 530 tons |
| No. of stays | : | 72 |
| Longest stay cable | : | 105 m |
| Max no. of strands per anchorage | : | 91 x 15.7 mm. dia |
| Main client | : | TAV SpA |
| Contractor | : | ASG scarl |
| Designer | : | MPA – Mario Petrangeli e Associati |
| Period | : | 2003 - 2006 |