High speed train line Milan – Bologna / Piacenza 1 and Piacenza 2 viaducts

13 11 2005
Piacenza viaduct is one of the structures along the new high-speed network in Italy
[...]


High Speed Freight Railway Line

02 07 2005
For the Port of Rotterdam, the Netherlands have built a dedicated Freight Railway Line
[...]


New Railway Station Bijlmer

06 05 2005
The development of a new railwaystation in the commercial and leasure area of Amsterdam South East is a mayor project.
[...]


Loureiro Viaduct

12 05 2003
The new A10 Highway between Bucelas and Carregado crosses the Loureiro river valley on a 1.050 m. long viaduct at a height of about 90 m. above water level
[...]


The Imigrantes Second Highway

07 01 2003
The second Imigrantes highway, inaugurated in December 2002, completes the Anchieta-Imigrantes Highway Complex linking the city of São Paulo to the port of Santos and the São Paulo State coast.
[...]


New Bridge over the River Tanaro - Tiziano Bridge

published: 15 09 2001
The structure stands on the Tanaro river between the current railway bridge of the Turin-Genoa line and the Cittadella highway road bridge, permitting a sensible improvement of the traffic flow from and to the Turin-Piacenza motorway in the town’s western sector.

The structure stands on the Tanaro river between the current railway bridge of the Turin-Genoa line and the Cittadella highway road bridge, permitting a sensible improvement of the traffic flow from and to the Turin-Piacenza motorway in the town’s western sector.
The Tiziano” bridge represents just one of the many interventions to repair damages caused by the flood events dating back to November 1994.
Some of the design constraints conditioning the engineering and construction aspects were:
span lengths of 25m. or a multiple thereof, to permit aligning the piers with those of the railway bridge located at about hundred meters upstream of the Tiziano;
a maximum deck depth of 2.35 m., to connect the new structure in altimetrically proper fashion to the existing street system in a strongly urbanized area of the town, while still assuring a one meter clearance above the 200 year high water.
Taking account of the constraints set forth above, it was decided to build the structure with a continuous beam of four spans 50 m. long, consisting of two 2.35 m. deep single-light boxes with 0.40 m. webs, set side by side and solidly joined longitudinally along the upper slab. Each box constituting the deck was built of prestressed concrete, using mixed prestressing, in part traditional with solidizing, in part external.

click to enlarge

 
Project : New Bridge over the River Tanaro - Tiziano Bridge
Location : Alessandria (AL)
Type : External post-tensioning with 19 MTAIE 15
Internal post-tensioning with 12 MTAI 15
Steel quantity : 170 tons
Viaduct length : 200 m.
N° of spans : 4 x 50 m.
Deck width : 16,50 m
Max. deck depth : 2,35 m.
Main Clien : Alessandria Municipality
Contractor : ATI CODELFA SPA(Tortona) (AL)
Designer : STUDIO SINTECNA (Torino) – Prof. Eng. G. Mancini
Technical supervision : Eng. Plinio Taverna
Period : 02/2000 - 08/2001