High speed train line Milan – Bologna

18 12 2006
The new railway linking Bologna to Milan is part of the High Speed Lines network at present under construction in Italy.
[...]


The "Colletta" cable stayed bridge over the Sangone creek

16 07 2005
During the October 2000 flood almost all the watercourses in the province of Turin that were tributaries of the Po river underwent exceptional high waters and consequent flooding, which caused enormous economic and environmental damage.
[...]


Arch bridge over the Twente canal

06 07 2005
The existing double railway bridge was too low and too old. The crossing with the Twente canal was too low; the bridge was technically at the end of its lifetime. A unique opportunity to design and build another railway cable-stayed bridge in the Netherlands.
[...]


Cable-stayed bridge over the River Paranaíba

04 11 2003
Although the Paranaíba Bridge was the first cable-stayed bridge to break ground in Brazil
[...]


Sea Pallini bridge, Athens

02 10 2003
The “Sea Pallini” cable stayed bridge, crossing the main highway reaching the new airport of Athens...
[...]


Sea Pallini bridge, Athens

published: 02 10 2003
The “Sea Pallini” cable stayed bridge, crossing the main highway reaching the new airport of Athens...

The “Sea Pallini” cable stayed bridge, crossing the main highway reaching the new airport of Athens, with the sharpened top of the inclined pylons and the mixture of red stays and a blue deck has certainly an unusual shape design.
The steel deck, preliminary placed on temporary beaings, and afterwards concreted with a top slab, is suspended with 6 stays, 4 made of 19 strands and 2 of 42 strands while pylons are made of post-tensioned concrete.
External hdpe sheathing for stays has been suitably chosen in a bright red colour, provided with special double helicoidal rib profile, suitable to avoid possible phenomena of instability due to wind-rain combined effect.
Stays have been installed as per standard procedure and have undergone a final operation of adjustment acting with dedicated Tensacciai jacks on adjustable anchorages placed on top of the pylons.

click to enlarge


Project : SEA PALLINI CABLE-STAYED BRIDGE
Location : Athens (Greece)
Main span
: 60 m.
Deck type
: steel
Stay cable
: 10,8 tons
No. of stays : 6
Max. no. of strands per anchorage : 42 - 15,7 mm. dia.
Main Client : MINISTRY OF PUBLIC WORKS (Greece)
Contractor : J.V.: J & P - AVAX - AKTOR (Greece)
Designer : DOMI O.E. - S. STATHOPOULOS - K. FARROS - Consulting Engineers (Greece)
Period : 06/2003 - 08/2003